30 Duke Warehouse

30 Duke Rd,

Piscataway, NJ 08854

Logo Drawing White
30 Duke Warehouse | Image 1

Project Sector

Industrial

Owner / Client

Levin Management

Architect

M+H Architects

Size / Area

78,000 sq. ft.

Firm Role

General Contractor

Key Features

Precast Concrete Warehouse Construction

Modern industrial warehouse using insulated and load-bearing precast concrete walls and a steel frame structure

High-Capacity Loading Dock Access

Includes 13 loading docks and one large overhead door with concrete ramp access, including one oversized dock

Integrated Office Space

3,000 sq. ft. office area constructed within the warehouse to support administrative operations

40-Foot Clear Height Ceiling

High-clearance design provides flexible vertical storage and operational flexibility

ESFR Fire Protection System

Outfitted with an ESFR (Early Suppression, Fast Response) fire sprinkler system for advanced fire safety and code compliance

30 Duke Warehouse | Image 2
30 Duke Warehouse | Image 3
30 Duke Warehouse | Image 4
30 Duke Warehouse | Image 5
30 Duke Warehouse | Image 130 Duke Warehouse | Image 230 Duke Warehouse | Image 330 Duke Warehouse | Image 430 Duke Warehouse | Image 5

Project Description

This modern industrial warehouse was constructed using insulated, load-bearing precast concrete wall panels combined with a steel frame structure. The design delivers long-term durability, energy efficiency, and quick construction turnaround — ideal for high-demand industrial applications.

The facility features 13 loading docks and one oversized overhead door with a concrete ramp, enabling efficient logistics and freight handling. A built-in 3,000 sq. ft. office space supports on-site administrative operations, allowing for seamless coordination between warehouse and office functions.

With a 40-foot clear height ceiling, the warehouse offers exceptional vertical storage capacity and layout flexibility. The structure is also outfitted with an ESFR (Early Suppression, Fast Response) fire sprinkler system, ensuring advanced fire protection and full code compliance.

This project reflects a high-performance design tailored to meet the operational demands of modern distribution, warehousing, and logistics environments.