Project Sector
Industrial
Owner / Client
Branca Properties
Architect
KSS Architects
Size / Area
75,000 sq. ft.
Firm Role
General Contractor
Precast Concrete Warehouse Construction
Modern industrial warehouse using insulated and load-bearing precast concrete walls and a steel frame structure
High-Capacity Loading Dock Access
Includes 15 loading docks and one large overhead door with concrete ramp access, including one oversized dock
Integrated Mezzanine Office Space
5,500 sq. ft. mezzanine office area constructed within the warehouse to support administrative operations
36-Foot Clear Height Ceiling
High-clearance design provides flexible vertical storage and operational flexibility
ESFR Fire Protection System
Outfitted with an ESFR (Early Suppression, Fast Response) fire sprinkler system for advanced fire safety and code compliance










This state-of-the-art industrial warehouse was constructed using insulated, load-bearing precast concrete wall panels in combination with a robust steel frame structure. The design prioritizes long-term durability, thermal performance, and rapid construction timelines — ideal for fast-paced industrial and logistics operations.
The facility includes 15 high-capacity loading docks and one oversized overhead door with a concrete ramp, including one oversized dock to accommodate a range of freight vehicles and distribution needs. This layout ensures efficient material handling and streamlined logistics.
A 5,500 sq. ft. mezzanine office space is fully integrated within the warehouse, offering a dedicated area for administrative and management functions without sacrificing valuable floor space. This built-in solution enhances coordination and operational efficiency across all departments.
With a 36-foot clear height ceiling, the warehouse provides generous vertical storage capabilities and flexible interior configurations to meet evolving business needs. The structure is also equipped with an ESFR (Early Suppression, Fast Response) fire sprinkler system, delivering advanced fire protection and ensuring full compliance with safety codes.
This project showcases a modern, high-performance facility engineered to meet the rigorous demands of today's warehousing, logistics, and distribution sectors.